Home
last modified time | relevance | path

Searched refs:completed (Results 26 – 46 of 46) sorted by relevance

12

/illumos-gate/usr/src/cmd/fm/eversholt/files/common/
H A Ddisk.esc132 * to complete. Once it has completed the diagnosis continues
/illumos-gate/usr/src/contrib/ast/src/cmd/ksh93/
H A DRELEASE12 some variables from getting restored when the subshell completed
457 command substition is not completed before the closing ), for
821 the subshell completed has been fixed.
997 block until the background process completed has been fixed.
1122 a core dump when the subshell completed has been fixed.
1273 loose output that was produced after the foreground completed
1335 jobs completed has been fixed.
2118 can be completed.
2130 completed quickly has been fixed.
2222 be closed before the subshell completed has been fixed.
[all …]
H A DREADME152 in sh/init.c has to be completed to interface with the dictionary
H A Dsh.memo2456 function call and restored when completed.
/illumos-gate/usr/src/test/zfs-tests/include/
H A Dlibtest.shlib1739 # is_pool_resilvered - to check if the pool is resilver completed
1741 # is_pool_scrubbed - to check if the pool is scrub completed
1745 # is_pool_removed - to check if the pool is remove completed
1791 check_pool_status "$1" "remove" "completed on"
/illumos-gate/usr/src/cmd/cmd-inet/usr.lib/wpad/
H A DREADME172 completed its work in May 2004. The IEEE 802.11i amendment to the IEEE
678 completed before data frames can be exchanged, so wpa_supplicant
/illumos-gate/usr/src/uts/common/io/qede/579xx/drivers/ecore/documentation/
H A Decore.tex1023 …\item After the basic initialization process is completed successfully, it is possible to establis…
1078 …river can post Login PDU to SQ. However FW will process SQ only after 3-way handshake is completed.
1149 …\item After the basic initialization process is completed successfully, it is possible to establis…
1437 … initiate an abortive teardown sequence with FW. Once the disconnect is completed, an ECORE\_IWARP…
1440 …ect / accept call will be called with the following values after disconnect has completed: \newline
1464 …ore will call upper layer driver with the following values after disconnect has completed: \newline
1548 …river. Ecore calls this function when the transmission of the packet is completed (it is called on…
1556 …ion from the device. When this function is called, ecore checks for non-completed Tx packet / Rx b…
/illumos-gate/usr/src/uts/common/io/nvme/
H A Dnvme.c1784 uint_t completed = 0; in nvme_process_iocq() local
1797 completed++; in nvme_process_iocq()
1800 if (completed > 0) { in nvme_process_iocq()
1810 return (completed); in nvme_process_iocq()
/illumos-gate/usr/src/uts/common/io/qede/579xx/drivers/ecore/
H A Drelease.txt504 chain before FW completed processing other packets placed on
508 previous data has completed transmission.
1759 In addition FLR Cleanup was not completed properly..
1946 completed its asynchronous operations.
2912 completed.
3437 3. Problem: Connection recovery failure - un-completed task cleanup.
4193 from the SQ might cause some SQ WQEs not to be completed.
/illumos-gate/usr/src/grub/grub-0.97/docs/
H A Dgrub.info-357 writes the completed Stage 1 to the first block of the device
450 process and it would not have completed the install).
H A Dgrub.texi2932 automatically. It then writes the completed Stage 1 to the first block
3305 would have been seen during that process and it would not have completed
H A Dgrub.info2766 writes the completed Stage 1 to the first block of the device
3159 process and it would not have completed the install).
/illumos-gate/usr/src/grub/grub-0.97/
H A DNEWS556 partially completed disk/partition/file-name combination. Try it
H A DChangeLog7069 determination is completed.
7585 Print the list of short docs when the command is completed.
/illumos-gate/usr/src/lib/libsqlite/src/
H A Dsqlite.h.in706 ** virtual machine. If the virtual machine has not completed execution
/illumos-gate/usr/src/cmd/sgs/liblddbg/common/
H A Dliblddbg.msg702 @ MSG_FIL_HDL_ORPHAN "handle=%s; deletion cannot be completed: moving to \
/illumos-gate/usr/src/uts/intel/io/acpica/
H A Dchanges.txt656 tree. The test has never been completed and has not been maintained, thus
3368 and FADT errors. Additional deployment to be completed as appropriate in
3510 completed.
4178 completed.
7609 execution is now completed before the SizeOf is executed. This problem
13006 The GPE Block Device support has been completed. New interfaces
13392 was not completed properly if the Local/Arg contained a reference
15589 Support for ACPI 2.0 variable length packages is fixed/completed.
16470 completed. The result is 1) cleaner and more
/illumos-gate/usr/src/lib/libdwarf/common/
H A Dlibdwarf.h.in586 are completed for you.
H A Dgenerated_libdwarf.h.in586 are completed for you.
/illumos-gate/usr/src/uts/common/io/fibre-channel/fca/emlxs/
H A Demlxs_sli4.c5555 if (cqe->consumed && !cqe->completed) { in emlxs_sli4_process_mbox_event()
/illumos-gate/usr/src/data/zoneinfo/
H A Dnorthamerica2286 # Yukon has completed its regulatory change to be on UTC -7 year-round....

12